Project 1-23 Concrete Street Paving Project – Week of September 5th

Posted on Sep 5, 2023 by

See below for a weekly construction update for the Concrete Street Paving Project. Click here for a project map.

Quinney Avenue, Metoxen Avenue, Dixon Street and Seventh Street Areas:

CONSTRUCTION – The contractor will be excavating Quinney Avenue and placing road stone.

If you have a driveway along Quinney Avenue, please find alternate while the contractor is working in front of your lot .

Loderbauer Road, White Dove Lane and White Birch Lane Areas:

CONSTRUCTION – This week the contractor will be filling the terrace area (between the sidewalk and curb) with fill (dirt) and shaping the terrace so the landscaper can place top, grass seed and mulch.

Greyhound Street, Boxer Street and Setter Drive Areas:

CONSTRUCTION – This week the contractor will be filling the terrace area (between the sidewalk and curb) with fill (dirt) and shaping the terrace so the landscaper can place top, grass seed and mulch.

Oak Street and Schultheis Street Areas:

CONSTRUCTION -The contractor is planning on doing the excavation and grading work on Oak Street and Schultheis Street.

If you have a driveway along Oak or Schulthies, please find alternate while the contractor is working in front of your lot

Canal Street Area:

CONSTRUCTION – The water main contractor will be finishing up the water main work.  They will also be replacing water services.