Skip Navigation

Lift Bridge Test Operations to Begin Monday, June 20

admin_post
June 17, 2022

Please note that as part of the final closeout of the Veterans Memorial Lift Bridge Rehabilitation Project, the City is required to perform several test lifts over a three-week break-in period. This break-in period begins Monday, June 20th, 2022. Lifts will typically take place between 8:30am-11:00am and between 1:00pm-2:00pm daily.

Please contact John Neumeier ([email protected]) at the City of Kaukauna for more information.

Article Author

admin_post