1-26 Concrete Street Paving Project

Week of August 17th

  • Martell-Complete sidewalk and Driveways on 9TH Street (M-F)

Week of August 24th

  • Martell-Complete sidewalk/Driveways (M)
  • Highway-Backfill and restore 9th Street (W-F)
  • Utility Traffic-Set up traffic control Bens Way, Setter & Boxer (W)
  • TNT-Concrete staking 1st sides of Brill/Eden/Sullivan/Hendricks (F)
    • Stake fine Grades (Bens, Setter & Boxer)

3-26 Alley Paving Project

  • The contractor will be doing the landscape restoration sometime next week.
  • The contractor plans to start work on the Fourth/Fifth alley and the Thirteenth/Fourteenth alley the week of August 24th.  They will start removing the existing pavement, excavation and placing stone in these alleys.

General Notes

DRIVEWAYS/PARKING – Please do not park on the road while the contractor is performing their work in the area. They need plenty of room for their trucks and equipment to be able to easily, quickly, and safely complete their work. Park in your driveway if possible, or on the nearest side street.

  • If you need special accommodations for parking, please reach out as we can arrange different parking options. This includes anyone with disabilities, recent surgeries, expecting mothers, and mothers with newborns that have appointments. Unfortunately, there is no “one size fits all” for parking and property access. The fewer cars that the contractor has to work around, the faster they can get the work done on your block and move on.

WORK ZONE SAFETY – While driving through the construction site, be sure to travel slowly and keep an eye out for equipment. This not only cuts down on dust, but also keeps the construction workers safe. Operators try their best to see traffic, but their view can be obstructed at times. It is always best to try and gain eye contact with equipment operators prior to driving by. You may need to wait at times before driving by depending on the work being performed. Please be patient during construction.

*  PLEASE NOTE THAT THIS WORK AND SCHEDULE CAN CHANGE DUE TO WEATHER OR UNFORSEEN CONSTRUCTION DELAYS. THESE UPDATES ARE TO AID THE COMMUNICATION PROCESS AS WE ALL WORK TOGETHER TO COMPLETE THIS PROJECT IN A TIMELY MANNER  *

Utility and Street Construction is not easy. There will be dirt, mud, dust, equipment, and workers everywhere. Construction activity will be noisy, and getting to your residence will be difficult at times. We understand that it can be frustrating while it happens, but we ask for your patience and understanding as we make the much needed improvements to your street and utilities. Please do not hesitate to contact our Engineering Department with any questions or concerns. We can’t help if we don’t know.